Latest issueFarm Show wants your voice: anthem entries are due Nov. 22Read now

← Harrisburg news

Getting AroundSunday, November 15

Bridge work will restrict lanes on I-81 and I-83 near Harrisburg Monday and Tuesday

The Daily Harrisburg teamFrom Sunday’s edition · 1 min read · 2 sources

ShareEmailFacebookX

If you drive I-81 or I-83 around Harrisburg early this week, give yourself extra time. PennDOT announced bridge work that will bring lane restrictions on I-81 and at the on I-83. The schedule can change with the weather, and we suggest checking before you head out.

The John Harris Bridge gets deck patching overnight Monday

I-83 southbound at the John Harris Bridge, Harrisburg to Lemoyne

Midnight6 a.m.Noon6 p.m.8 p.m.to 6 a.m.
  • 8 p.m. to 6 a.m.Deck patching leaves I-83 south with one lane
Dates
Mon., Nov. 16 to Tue., Nov. 17
Stretch
Exit 43 to Exit 42

Source: ABC27

View as table
WhenWhat
8 p.m. to 6 a.m.Deck patching leaves I-83 south with one lane
DatesMon., Nov. 16 to Tue., Nov. 17
StretchExit 43 to Exit 42
  • Exit 67A: southbound bridge to Route 22/230 East (Cameron Street)
  • Exit 67B: northbound bridge to Route 22/322 West (Lewistown/State College)
  • I-83 south: one lane, Second Street ramp to Lemoyne ramp

The John Harris Memorial Bridge is also at the center of a $1.3 billion project to “modernize” I-83 south in the Harrisburg area. PennDOT received an apparent low bidder on Friday. If the bid materials are approved, the contractor will receive a contract and be cleared to begin construction, and drivers can expect traffic shifts, lane restrictions, road closures and detours.

Bridge inspections and patching come first, then a long build

  1. Nov. 13PennDOT received an apparent low bidder for the I-83 south project.
  2. Nov. 16Northbound I-81 inspections run from 9 a.m. to 2 p.m.
  3. Nov. 16Deck patching on the starts at 8 p.m.
  4. Nov. 17Southbound I-81 inspections run 9 a.m. to 2 p.m.; patching ends at 6 a.m.
  5. 2027Construction on the I-83 south project is expected to begin.
  6. 2039PennDOT expects construction on the I-83 south project to last through 2039.

Sources: ABC27, WHP Harrisburg

Read it in the full edition

More from Sunday’s edition

Read the edition
All getting around news
  1. 28/22 News13 hours ago

    VIDEO: Train breaks down, blocks multiple crossroads in Luzerne County, on 28/22 News

    LUZERNE COUNTY (WBRE/WYOU) — A Norfolk freight train traveling from Harrisburg has reportedly broken down, leaving multiple crossroads blocked in Pittston Township Sunday. PennDOT Engineer Rusty Fender confirmed with 28/22 News that Norfolk officials are on the scene and are currently working to clear the train from the crossroads. Authorities say the freight train, which

  2. WCCS AM1160 & 101.1FMYesterday

    A BUSY SCHEDULE OF ACTIVITITES THIS WEEK IN INDIANA COUNTY, on WCCS AM1160 & 101.1FM

    A busy week of activities in Indiana County this week includes the Fifth Annual IUP/IRMC Pennsylvania Mountains Rural Health Conference, which is sche...

  3. WGALYesterday

    FAA Ground Stop Causes Nationwide Travel Disruptions, Leaves Harrisburg-Bound Passengers Stranded, on WGAL

    More than 24 hours after the Federal Aviation Administration (FAA) issued a nationwide ground stop, airports across the country are still working to recover from widespread flight cancellations and delays.

    Also reported byPennLive

  4. WPMTNov. 14

    Harrisburg Airport recovers after nationwide ground stop, though challenges still linger for some travelers, on WPMT

    Flights at Harrisburg International are mostly back on schedule, but passengers like Benjamin Souder face ongoing challenges with re-booking his flight to California